5 Profit Leaks Hiding in Your Construction Business

Free checklist used by 300+ builders doing $1.5M–$15M to find $50K–$200K in hidden margin — without adding a single new project.

  • The markup vs. margin math error silently underpricing every job — and the 60-second correction that fixes it
  • Why $50K–$150K walks out the door each year through untracked change orders — and the exact workflow to stop it
  • The job-costing gap that makes it impossible to tell which projects are profitable until they close
  • How cost code chaos destroys your data — and the 25-code structure that actually drives decisions
300+
Builders who've used this
$50K–$200K
Hidden margin found
$1.5M–$15M
Builder ICP

Join 300+ builders who've used this framework to stop bleeding margin on work they've already won.

📋
Send Me the Free Checklist

Enter your name and email — we'll send the checklist straight to your inbox.

We'll send you the checklist and one follow-up email. No spam, ever.

Check Your Inbox

The checklist is on its way. While you wait — see the 5 profit leaks it covers below.

What's inside

The 5 Profit Leaks Hiding in Your Numbers

Most builders have at least 3 of these. Most don't know until they run the checklist.

Leak #1
The Markup Trap

30% markup is not 30% margin. The formula difference silently underprices every job — costing most builders $60K–$200K per year on a $2M revenue base.

Leak #2
The Change Order Drain

Untracked scope changes are the single biggest profit leak in construction. A $3M builder doing informal change orders loses $150K in profit every year — often without knowing it.

Leak #3
No Job-Level P&L

If you can't tell which active jobs are profitable without a phone call, you're flying blind. You can't course-correct on a losing job until it closes — which is too late.

Leak #4
Cost Code Chaos

40–100 cost codes with duplicates and "miscellaneous" buckets destroy your data. When codes don't map to decisions, job costing becomes an accounting exercise nobody trusts.

Leak #5
The Shadow System Problem

The spreadsheets and notebooks running alongside your "official" PM tool are evidence your system isn't handling what your team needs — and that knowledge is locked in your head.