The Budget Roadmap. Zero change orders during construction.
The fillable template design-build remodelers use to walk a client from a $640K–$780K ballpark to one fixed-price number. Every selection decided on paper. Every price said out loud the moment it is picked.
4
budget stages
7–9
days to first roadmap
0
construction change orders
Unlock the template
Fillable roadmap, spreadsheet download, and the 5 operating rules. Unlocks instantly on this page.
No spam. One template, one guide. Grant may follow up once to ask how it worked.
BLUF
Clients want two things during design: information and a feeling of control over their money. The Budget Roadmap gives them both in writing. It moves the pricing conversation off a tug of war and onto the same side of the table, solving for a target budget together. The remodelers running it report the same outcome: selections finished on paper, contracts signed at a single number, and construction that runs without change orders.
The guide and template unlock above
Four budget stages, four document components, five operating rules, and a fillable roadmap you can print or download as a spreadsheet.