Equip your foremen with the tools they need to succeed. This 300-point onsite checklist provides a framework for consistent quality control, empowering your team to take ownership and deliver exceptional results.
Reinforcing steel installed per engineer specifications.
Concrete cover aligns with specifications.
Height pegs within 2mm of datum.
Starter rods checked for alignment.
Timber piles treated and installed correctly.
Concrete punch pads installed if needed.
Health & Safety
Barriers installed, public safety ensured
Exposed excavation batters have polythene protection from erosion
Excavation of trench deeper than 1.5m has hordings installed
HI VIZ is being worn around machinery
Reinforcing safety caps installed Roads and access are kept clean
Wash down station set up if required
No silt run off to go into any drainage
Refer to council's provision if required
Concrete wash down area determined
Ensure NO contamination of drainage
All tools and machinery are used correctly and safely
QUALITY CONTROL
03. SUBFLOOR FRAMING
—
Tasks
Pile connections verified.
Bracing installed per plan including nogs and connections.
Joist hangers and bolts installed securely as per plans.
Timber treatment verified for compliance.
Flooring fixed as per manufacturer specs.
Insulation installed where access is restricted.
Joist spacing and type verified.
Polythene sheets installed where needed.
Plumbing considerations incorporated into subfloor design.
Health & Safety
All trash removed from under sub floor
Site clean and tidy for next stage
Safety of team and public is ensured at all times
All team members are using P.P.E
All tools and machinery are used correctly and safely
QUALITY CONTROL
04. WALL FRAMING
—
Tasks
Timber treatment is checked and verified
Bracing elements identified and installed
Fixings/connections verified and installed
Lintel sizes checked and installed as per plans
Stud spacing checked and installed as per plans
Nogs and extra fixings are taken into consideration for exterior cladding, flashings and junctions
Consideration given for structural steel
Consideration given for sub-contractor services
Engineer and council have inspected work
Health & Safety
All team member are using P.P.E
Site has been left clean and tidy for next stage
Public and team safety has been ensured
All tools and machinery are used correctly and safely
QUALITY CONTROL
05. STRUCTURAL STEEL
—
Tasks
Confirmation of details at installation
Heights checked and confirmed with site datum
Position of posts and beams don’t affect claddings, linings and roofing
Structural engineer has inspected details
Bolt fixings Epoxy has been correctly applied, holes drilled to correct diameter, holes cleaned
Posts shimmed in place, ready for dry pack application
Dry pack installed as per engineers’ specs
Health & Safety
All crane work conducted safely
All team members to wear hard hats and HI VIZ
Public and team safety has been ensured
All tools and machinery are used correctly and safely
QUALITY CONTROL
06. EXTERIOR CAVITY CONSTRUCTION
—
Tasks
Check adequate fixing for cladding, especially around flashings, junctions and corners
Window openings confirmed before paper tapes installed
Building wrap installed, 150mm laps
All flashing tapes installed as per plans
Cavity vent strips installed as per plans
Cavity batten treatment checked and verified
Cavity batten fixings checked and verified
Cavity battens installed correctly
Horizontal cavity blocks installed with gap for airflow and on an angle as per specs
Flashings installed to junctions or corners as per plans
Compatibility of materials checked and confirmed
All work inspected by council and building consultants before proceeding
Health & Safety
All scaffolding and working platforms are safe and compliant
Tape is installed to large panes of glass, for others to identify glass is in place
All scaffolding and working platforms are safe and compliant
All team member are using P.P.E
Public and team safety has been ensured
Site has been left clean and tidy for next stage
All tools and machinery are used correctly and safely
QUALITY CONTROL
07. EXTERIOR JOINERY
—
Tasks
Joinery viewed before unloading truck for defects, issues documented and supplier notified
Tapes and building paper checked as per plan and details
Correct clearances for flashing and claddings/linings determined
Window flashings installed correctly
Window jambs, screw fixed counter sink by min 2mm ready for painting
PERF ROD installed as per plans and specs
Foam installed as per plans and specs
Council inspected details
Building consultant inspected details
Windows installed level, consideration given to align all windows to same height
All windows that are stored onsite are secured to prevent damage
All doors and windows are functional and operating smoothly
Health & Safety
All scaffolding and working platforms are safe and compliant
Tape is installed to large panes of glass, for others to identify glass is in place
All scaffolding and working platforms are safe and compliant
All team member are using P.P.E
Public and team safety has been ensured
Site has been left clean and tidy for next stage
All tools and machinery are used correctly and safely
QUALITY CONTROL
08. EXTERIOR CLADDING
—
Tasks
Material quality has been checked on delivery
Check treatment and grade of materials
Materials are stored off the ground, out of weather
Building wrap accessed for holes, tears, repairs complete
Plans and details are checked for set out
Bottom plate cover is achieved as per plans and specs
Datum height is established for all cladding
Check compatibility of materials and fixings
Cladding has been fixed off in accordance with specs
Cladding edges have been primed where required
All fixings have been installed ready for painter
Corner flashings and junctions have been installed correctly
Cavity bottoms and fixings have been installed correctly
Vent strips have been installed correctly
Health & Safety
All scaffolding and working platforms are safe and compliant
Tape is installed to large panes of glass, for others to identify glass is in place
All scaffolding and working platforms are safe and compliant
All team member are using P.P.E
Public and team safety has been ensured
Site has been left clean and tidy for next stage
All tools and machinery are used correctly and safely
QUALITY CONTROL
09. BATHROOM
—
Tasks
Plumbing outlets confirmed by designer/client and plumber briefed
All plumbing has been under pressure water test, no evidence of leaks
All required services have been installed - Electrical, under floor heating……
Silicon is installed to plumbing pipes to stop ‘pipe banging’
Framing for substrates installed as per plans and specs
Substrates installed as per plans and specs
Nogs for fixtures and fittings installed and noted/photos taken
Insulation installed to required areas Linings have been correctly installed
Water proofing installed correctly, adequate time given to dry, water tested and passed
Tile set out confirmed by designer/owner, tilier brief
Council inspections have all passed
Tiles have been installed correctly, required edges silicone
Internal doors installed correctly with screws, correct tolerances/clearances around door/correct allowances for floor coverings
Door stops installed correctly with 2mm clearance on hinge side
Hardware check outs complete before painting
Arcatraves installed correctly with PVA glued mitres, all flush
Skirting installed correctly top edge PVA glued
Shelves and other required finishing lines installed correctly
Health & Safety
All team member are using P.P.E
Public and team safety has been ensured
Site has been left clean and tidy for next stage
All tools and machinery are used correctly and safely
QUALITY CONTROL
10. INTERIOR LININGS
—
Tasks
Insulation installed to all required areas
All plumbing is under pressure water test, no evidence of leaks
Silicon installed to plumbing pipes to stop ‘pipes banging’
All electrical wires installed
Other required services installed, Alarm etc.
Wires and pipes marked out, photos taken to avoid fixing penetration
Bracing elements identified and installed
Council inspected before linings
Framing has been checked to be straight and true
Nogs have been installed for light fittings, towel rails and other fittings
GIB fixings have been installed to the correct spacing and depth ready for GIB stopper
All windows have been installed correctly with PERF ROD & FOAM
Electrical has been installed correctly, all functional
Splash backs installed correctly
Gas has been installed correctly, all functional
All cupboards and draws have been cleared out
Health & Safety
All team member are using P.P.E
Public and team safety has been ensured
Site has been left clean and tidy for next stage
All tools and machinery are used correctly and safely
QUALITY CONTROL
11. KITCHEN
—
Tasks
Service locations are confirmed with designer/client, sub-contractors briefed
All services are installed
All plumbing is under pressure test/no signs of leaks
Plumbing silicon has been installed to pipes to stop ‘pipe banging’
Extra fixings installed, if required
Walls are straight and true, for cabinets
Council has carried out inspections and passed
Services are clearly marked to prevent penetrations, photos taken
Cabinetry and bench tops have been installed correctly
Anyone working over bench tops uses drop sheets
Cabinet cupboards and draws are all functional and aligned
Silicon has been installed correctly to base of cabinetry to prevent moisture been sucked up
Plumbing has been installed correctly, all functional, no sign of leaks
Excavation cut has enough room to work behind wall and is battered
Pile diameters and depth are correct
Council and engineer have inspected
Timber treatment and quality have been confirmed on delivery
Piles set to stringline, board side takes precedence
Drainage has been installed as per plans
All boards have been nailed off as per plans, laps checked
Engineer has viewed before backfilling
Hand rails have been installed as per plans
Retaining wall complete
Health & Safety
All team member are using P.P.E correctly
Ensured team and public safety at all times, exposed holes covered
All tools and machinery are used correctly and safely
HI VIZ is worn when machinery is operational on site
QUALITY CONTROL
12. DECKS/LANDSCAPE
—
Tasks
Details confirmed before commencement and issues discussed before starting
Set out and location confirmed as per plans
Timber treatment and quality confirmed on delivery
All excavation as per plans with sufficient concrete cover
Confirm with designer/client heights, steps etc.
Concrete installed to piles above G.L to prevent water ponding
Deck has min 12mm separation from other structures
Joist hangers have been installed/ all stainless steel
All bolts have been installed all stainless steel
Pile connections are as specked and installed correctly
Bracing has been installed as per plans and specs
Check all decking has been nailed off correctly
Hand rails as per plans and are compliant, no more than 100mm gap
Set out and location confirmed and as per plans
Health & Safety
All team member are using P.P.E correctly
Hand rails and scaffolding are compliant
Site is kept clean and tidy at all times
HI VIZ and hard hats are to be worn when cranes in operation
All tools and machinery are used correctly and safely is operational on site
QUALITY CONTROL
13. ROOFING
—
Tasks
All flashing laps have been riveted (typical 60mm centres) and sealed, surplus sealant removed, laps are correct
All fixings (tek screws) have been installed correctly, not over driven or on an angle
Roof checked for defects or marks
Control joints have been allowed for
All flashing details have been completed in a tradesmen manner as per plans and specs, correct upstands and laps
Roofing and flashing gauge is correct
Roof protection has been installed for other contractors working on roof
Roof penetrations have been flashed correctly
Correct roofing underlay has been installed as per plans and specs
Team and public safety has been ensured at all times
All painting complete
Health & Safety
All team member are using P.P.E correctly
Hand rails and scaffolding are compliant
Site is kept clean and tidy at all times
All tools and machinery are used correctly and safely is operational on site
QUALITY CONTROL
14. PLASTERBOARD
—
Tasks
Plasterboard compound has had sufficient time to dry in between coats
No build-up of compound on finishing lines
Stopping checked with halogen light for imperfections
Site left clean and tidy ready for painter
All plaster complete
Health & Safety
Team and public safety has been ensured at all times
Site is kept clean and tidy at all times
All tools and machinery are used correctly and safely
Site is left clean and tidy, rubbish removed or placed in designated area
Team and public safety has been ensured at all times
Site is kept clean and tidy at all times
All tools and machinery are used correctly and safely
QUALITY CONTROL
15. ELECTRICAL
—
Tasks
Client/designer confirmed location and fitting types
All prewire complete
Confirmation from electrician no other additional fixing required
All lights have been installed correctly and are operational
All power points have been installed correctly and are operational
All other fixtures and fittings have been installed correctly
No wall/ceiling damage from installing fittings
Lights align and fitting and fixtures installed level/plumb
All exterior fixtures and fittings installed with stainless steel screws
Appliances are all operational
Health & Safety
Team and public safety has been ensured at all times
All tools and machinery are used correctly and safely
Site is left clean and tidy, rubbish removed or placed in designated area
Team and public safety has been ensured at all times
QUALITY CONTROL
16. PLUMBING
—
Tasks
Client/designer confirmed location and fitting types
Confirmation from plumber no additional fixing required
All required pipes silicone to stop “pipe banging”
All plumbing complete and under water test before linings, no evidence of leaks
Council Pre lining inspection passed
Fixtures and fittings installed correctly and all operational
Silicon applied to required areas -toilet bases, basin edges….
Health & Safety
Team and public safety has been ensured at all times
All tools and machinery are used correctly and safely
Site is left clean and tidy, rubbish removed or placed in designated area
QUALITY CONTROL
POST-CONSTRUCTION WRAP UP CHECKLIST
—
Administrative Tasks
Ensure all inspections are completed and certificates obtained (e.g., occupancy, plumbing, electrical, fire safety).
Verify compliance with all contractual requirements and local building codes.
Provide the client with a final project handover package, including warranties, manuals, and as-built drawings.
Obtain signed client acceptance forms confirming project completion.
Finalize all outstanding invoices and financials with subcontractors and suppliers.
Close out any open permits with local authorities.
Physical Review
Conduct a final walkthrough with the client to confirm that all elements meet expectations.
Address any items on the punch list; ensure all corrections are completed.
Verify that all systems (HVAC, plumbing, electrical) have been tested and are operational.
Ensure that all finishes (paint, flooring, trim) meet quality standards.
Documentation
Compile and archive all project documents (permits, inspections, daily logs, meeting notes).
Record and save any final project photographs for reference or marketing purposes.
Submit a final project report to the client, summarizing milestones, challenges, and resolutions.
Handoff & Post-Completion
Conduct a client orientation session to explain key systems (e.g., HVAC, security, smart home features).
Provide contact details for warranty claims or post-construction support.
Offer a maintenance checklist or schedule to ensure long-term performance.
Confirm the client has all required keys, passwords, and access instructions.
Conduct a post-project review meeting with the internal team to document lessons learned.
Celebrate project success with the team to boost morale and reflect on achievements.
Follow up with the client after 30 days to ensure ongoing satisfaction.
Send a feedback request or survey to gather client insights for future improvements.
Update your portfolio or website with project highlights and testimonials, if permitted.
Provide a referral incentive or thank-you gift for the client’s cooperation and trust.
Share an optional maintenance plan or extended warranty offers, if available.
Add the client to your CRM for future communications (e.g., holiday greetings, service updates).
Encourage the client to leave an online review or testimonial.
Proactively offer continued support for any future projects or modifications.
Verify and document that the project site is in pristine, handover-ready condition.
THE FRAMEWORK
GROW WITH GO FIRST IN 3 EASY STEPS
Your Path to a predictable pipeline
START
Our assessment uncovers your biggest growth opportunities. We'll identify gaps, set goals, and align on your vision.
build
We implement a step-by-step program that turns insights into action. We'll tackle one priority area each week helping you maintain progress and crush your goals.
scale
We test & optimize all aspects of your marketing so you can grow faster and maximize return on investment.